Difference between revisions of "Deppermann2013b"
PaultenHave (talk | contribs) (Created page with "{{BibEntry |BibType=ARTICLE |Author(s)=Arnulf Deppermann; |Title=Turn-design at turn-beginnings: Multimodal resources to deal with tasks of turn-construction in German |Tag(s...") |
AndreiKorbut (talk | contribs) m |
||
Line 1: | Line 1: | ||
{{BibEntry | {{BibEntry | ||
|BibType=ARTICLE | |BibType=ARTICLE | ||
− | |Author(s)=Arnulf Deppermann; | + | |Author(s)=Arnulf Deppermann; |
|Title=Turn-design at turn-beginnings: Multimodal resources to deal with tasks of turn-construction in German | |Title=Turn-design at turn-beginnings: Multimodal resources to deal with tasks of turn-construction in German | ||
− | |Tag(s)=EMCA; Turn Construction; Multimodality; German; | + | |Tag(s)=EMCA; Turn Construction; Multimodality; German; |
|Key=Deppermann2013b | |Key=Deppermann2013b | ||
|Year=2013 | |Year=2013 | ||
Line 9: | Line 9: | ||
|Volume=46 | |Volume=46 | ||
|Number=1 | |Number=1 | ||
− | |Pages= | + | |Pages=91–121 |
+ | |URL=http://www.sciencedirect.com/science/article/pii/S0378216612001890 | ||
+ | |DOI=10.1016/j.pragma.2012.07.010 | ||
+ | |Abstract=Based on German speaking data from various activity types, the range of multimodal resources used to construct turn-beginnings is reviewed. It is claimed that participants in talk-in-interaction need to deal with four tasks in order to construct a turn which precisely fits the interactional moment of its production: | ||
+ | 1. Achieve joint orientation: The accomplishment of the socio-spatial prerequisites necessary for producing a turn which is to become part of the participants’ common ground. | ||
+ | 2. Display uptake: Next speaker needs to display his/her understanding of the interaction so far as the backdrop on which the production of the upcoming turn is based. | ||
+ | 3. Deal with projections from prior talk: The speaker has to deal with projections which have been established by (the) previous turn(s) with respect to the upcoming turn. | ||
+ | 4. Project properties of turn-in-progress: The speaker needs to orient the recipient to properties of the turn s/he is about to produce. | ||
+ | Turn-design thus can be seen to be informed by tasks related to the multimodal, embodied, and interactive contingencies of online-construction of turns. The four tasks are ordered in terms of prior tasks providing the prerequisite for accomplishing a later task. | ||
}} | }} |
Revision as of 05:54, 6 March 2016
Deppermann2013b | |
---|---|
BibType | ARTICLE |
Key | Deppermann2013b |
Author(s) | Arnulf Deppermann |
Title | Turn-design at turn-beginnings: Multimodal resources to deal with tasks of turn-construction in German |
Editor(s) | |
Tag(s) | EMCA, Turn Construction, Multimodality, German |
Publisher | |
Year | 2013 |
Language | |
City | |
Month | |
Journal | Journal of Pragmatics |
Volume | 46 |
Number | 1 |
Pages | 91–121 |
URL | Link |
DOI | 10.1016/j.pragma.2012.07.010 |
ISBN | |
Organization | |
Institution | |
School | |
Type | |
Edition | |
Series | |
Howpublished | |
Book title | |
Chapter |
Abstract
Based on German speaking data from various activity types, the range of multimodal resources used to construct turn-beginnings is reviewed. It is claimed that participants in talk-in-interaction need to deal with four tasks in order to construct a turn which precisely fits the interactional moment of its production: 1. Achieve joint orientation: The accomplishment of the socio-spatial prerequisites necessary for producing a turn which is to become part of the participants’ common ground. 2. Display uptake: Next speaker needs to display his/her understanding of the interaction so far as the backdrop on which the production of the upcoming turn is based. 3. Deal with projections from prior talk: The speaker has to deal with projections which have been established by (the) previous turn(s) with respect to the upcoming turn. 4. Project properties of turn-in-progress: The speaker needs to orient the recipient to properties of the turn s/he is about to produce. Turn-design thus can be seen to be informed by tasks related to the multimodal, embodied, and interactive contingencies of online-construction of turns. The four tasks are ordered in terms of prior tasks providing the prerequisite for accomplishing a later task.
Notes