Difference between revisions of "Suchman2000c"

From emcawiki
Jump to: navigation, search
(Created page with "{{BibEntry |BibType=ARTICLE |Author(s)=Lucy Suchman; |Title=Organising alignment: a case of bridge-building |Tag(s)=EMCA; Heterogeneous engineering; ordering; organizational e...")
 
 
Line 10: Line 10:
 
|Volume=7
 
|Volume=7
 
|Number=2
 
|Number=2
|Pages=311-327
+
|Pages=311–327
|URL=http://org.sagepub.com/content/7/2/311
+
|URL=https://journals.sagepub.com/doi/abs/10.1177/135050840072007
 
|DOI=10.1177/135050840072007
 
|DOI=10.1177/135050840072007
 +
|Abstract=The project of building a bridge is a canonical example of what John Law (1987) has termed 'heterogeneous engineering', involving the arrangement of human and nonhuman elements into a stable artifact. This paper reports ethnographic research on the work of civil engineers engaged in designing a bridge scheduled for completion by the year 2004. My emphasis is on a view of bridge-building as persuasive performances that both rely upon and reflexively constitute the elements to be aligned. The work of designing a bridge, on this view, is as much a matter of story-telling as of analysis, calculation, and work with concrete and steel.
 
}}
 
}}

Latest revision as of 11:27, 27 October 2019

Suchman2000c
BibType ARTICLE
Key Suchman2000c
Author(s) Lucy Suchman
Title Organising alignment: a case of bridge-building
Editor(s)
Tag(s) EMCA, Heterogeneous engineering, ordering, organizational ethnogrphy, performance, planning
Publisher
Year 2000
Language English
City
Month
Journal Organization
Volume 7
Number 2
Pages 311–327
URL Link
DOI 10.1177/135050840072007
ISBN
Organization
Institution
School
Type
Edition
Series
Howpublished
Book title
Chapter

Download BibTex

Abstract

The project of building a bridge is a canonical example of what John Law (1987) has termed 'heterogeneous engineering', involving the arrangement of human and nonhuman elements into a stable artifact. This paper reports ethnographic research on the work of civil engineers engaged in designing a bridge scheduled for completion by the year 2004. My emphasis is on a view of bridge-building as persuasive performances that both rely upon and reflexively constitute the elements to be aligned. The work of designing a bridge, on this view, is as much a matter of story-telling as of analysis, calculation, and work with concrete and steel.

Notes